Las Cruces Yard Care Calendar: What to Do Every Month

Yard calendars written for the rest of the country get Las Cruces wrong: we plant in fall, fight weeds in February, and get most of our rain in July. Here’s a month-by-month plan built for the Mesilla Valley, from pruning and pre-emergent to monsoon prep and Bermuda lawn care.

Updated September 2026. Timing based on NMSU Extension guidance for southern New Mexico, which lists about 267 frost-free days a year for the Las Cruces area.

Lawn care Las Cruces NM - freshly mowed and edged front lawn in front of a two-story home
  • Prune in winter
  • Pre-emergent in late winter
  • Plant in fall
  • Prep for monsoon in June

Quick answer

What should I do in my Las Cruces yard each season?

In winter, prune dormant trees, water deeply once a month and apply goathead pre-emergent. In spring, start up irrigation and pull weeds early. In summer, thin trees before monsoon winds and clear drainage. In fall, plant trees and shrubs and cut back watering.

The four jobs that matter most

  • February: pre-emergent for goatheads and spring weeds
  • March: irrigation start-up and leak check
  • June: tree thinning and drainage prep before monsoon
  • October: plant trees and shrubs

Month by month

What yard jobs should you do each month in Las Cruces?

January and February are for dormant pruning, monthly deep watering and goathead pre-emergent. March starts irrigation and Bermuda green-up. May to September brings lawn feeding, tree thinning and monsoon prep. October and November are for planting and cutting back watering.

Month

Top jobs

Watering

January

Prune dormant shade and fruit trees; cut back ornamental grasses; plan spring projects

Deep water trees and shrubs about monthly on a mild day

February

Pre-emergent for goatheads and weeds; finish pruning; vacuum burrs from gravel

Monthly deep watering; check controller for spring

March

Irrigation start-up: flush drip, fix leaks and broken heads; scalp Bermuda before green-up; plant early

Increase run times as days warm

April

Bermuda green-up; pull weed seedlings weekly; windproof loose items; plant heat-lovers

Summer hours start April 1: before 10 a.m. or after 6 p.m.

May

Fertilize Bermuda; top up thin rock; check drip emitters on new plants

Water on all 3 days as heat builds

June

Thin mesquite and palo verde before monsoon winds; clear swales, gutters and downspouts; no new planting

Peak demand; deep, early-morning runs

July

Monsoon: watch where storm water goes; pull weed flushes after rain; check for washouts

Use rain delay after storms

August

Keep pulling goatheads before they seed; mow Bermuda regularly; second weed flush

Adjust after heavy rains

September

Last Bermuda feeding; fix monsoon damage; plan fall planting

Summer hours end September 30

October

Best planting month; plant trees, shrubs and wildflower seed; overseed only if you want winter green

Cut run times as nights cool

November

Keep planting early in the month; rake leaves before wind; last goathead pull before frost

Reduce to every 2 to 3 weeks for most shrubs

December

Protect exposed backflow devices and pipes on freezing nights; clean and sharpen tools

Deep water monthly on mild days

City of Las Cruces watering days apply all year: even addresses Tue, Thu, Sat; odd addresses Wed, Fri, Sun; no watering Monday.

By plant

When is the best time for each yard task in Las Cruces?

Prune shade and fruit trees January to March, thin mesquite and palo verde in late spring before July, plant trees and shrubs in October and November, apply goathead pre-emergent late January to February, and fertilize Bermuda from May to early September.

Plant or task

Best time

Avoid

Shade and fruit tree pruning

January to March (dormant)

Heavy pruning in summer heat

Mesquite and palo verde thinning

Late spring, before July

Stripping the canopy

Planting trees and shrubs

October to November; March second best

June to August

Goathead pre-emergent

Late January to February

Waiting until you see plants

Bermuda fertilizing

May to early September, while actively growing

While dormant

Bermuda scalping

Early spring, before green-up

After green-up

Cutting back ornamental grasses

Late winter

Fall (they protect the crown)

Irrigation start-up check

March

Waiting for plants to wilt

Pruning timing from NMSU Extension Guide H-156; goathead timing from NMSU Guide H-187; Bermuda scalping from NMSU Guide H-505.

Seasons

What does a Las Cruces yard year look like?

A Las Cruces yard year runs in five seasons: winter pruning and deep watering, spring irrigation start-up and wind, early summer tree thinning and drainage prep, monsoon season with rain delays and weed flushes, and fall planting with reduced watering.

1

Winter

Prune, deep water monthly, pre-emergent, plan.

2

Spring

Irrigation start-up, Bermuda wakes up, pull weeds early, expect wind.

3

Early summer

Thin trees, clear drainage, water deeply and early.

4

Monsoon

Rain delay, watch runoff, pull weed flushes, fix washouts.

5

Fall

Plant, cut watering back, rake, prepare for winter.

Common mistakes

What yard calendar mistakes do Las Cruces homeowners make?

The most common mistakes are planting in June, skipping the February goathead pre-emergent, leaving controllers on summer settings into November, not watering trees at all in winter, and topping trees in summer heat. Each one costs plants, water or a summer of weeding.

  • Planting in June because that’s when garden centers are full. New plants struggle through their first heat.
  • Skipping the February pre-emergent, then fighting goatheads all summer.
  • Leaving the controller on summer settings into November, wasting water and drowning desert plants.
  • Not watering at all in winter. Dry winter wind damages roots of trees and shrubs.
  • Topping trees in summer, which stresses them and exposes bark to sunscald.
Lawn care Las Cruces NM - freshly mowed and edged front lawn in front of a two-story home

A Bermuda lawn needs the most attention from May to September.

Las Cruces yard calendar FAQs

Prune most shade and fruit trees while dormant, from January to March. Thin mesquite and palo verde in late spring, before monsoon winds in July. Remove dead or broken limbs any time.

Late January to February, before goatheads and spring weeds start sprouting in March. Always follow the product label.

October and November. Roots grow through the mild winter before the June heat. March is the second-best window.

Usually in April as soil warms. Scalping the dormant lawn low in early spring, before green-up, helps it wake up faster, according to NMSU Extension.

While it’s actively growing, from about May to early September. Don’t fertilize while it’s dormant.

Yes, lightly. Deep water trees and shrubs about once a month on a mild day, on your watering days.

From April 1 to September 30, outdoor watering is allowed only before 10 a.m. or after 6 p.m. on your address days.

In June, thin top-heavy trees, clear swales, gutters and downspouts, and check that the ground slopes away from your house.

Want your yard on the right schedule?

We’ll set up a year-round plan that follows the Las Cruces calendar for you. Free, written estimate.

  • We call back the same business day
  • Free, written, itemized estimates
  • One-time jobs welcome; no contract
  • Serving Las Cruces, Mesilla and Doña Ana County

Las Cruces Landscaping Group
1921 Santa Ines Drive, Las Cruces, NM 88011
(575) 270-0676. Mon to Sat, 7 a.m. to 7 p.m.

Request a Free Estimate

Takes under a minute. We’ll call you back today.

Similar Posts

Leave a Reply

Your email address will not be published. Required fields are marked *